Budgetary Estimate Software for Wind-power Project Design(WEC)

1. Overview
"Budgetary Estimate Software for Wind-power Project Design (WEC)" is one content part of "CFD Wind-power Software Series" which is a software package for wind power industry developed by China Hydropower Engineering Consulting Group Co. in conjunction with the Beijing-Millennium Engineering Software Technology Co., Ltd¡­ It is based on the standards of budgetary estimate on feasibility study report and "Technical Codes for Wind Farm Budget Estimation". It is designed to achieve the budget making, calculation and collection of material, labor and machine, basic data management, project file management and so on.

2. Characteristics
¡óWith distinct process based on the actual operation

¡óWith perspicuity interfaces and clear relationship between data

¡ó Flexibility price adjustment, easy and simple to handle

¡óStandard format of statements


3. Functions

(1)New Project
Establish a new project, importing description for this project and saving it as ¡°*.wec¡±, as follows:

New project

Project information

Description

(2) Budget Item Checklist
In the window, add the section and item by clicking the buttons such as [insert section], [insert sub-section], [add item]. A list of items includes units, amount, etc¡­

The window of budget items

(3) Engineering Unit Price
Chose the item which is need to be edited on the list, add a specific item, select the type of charge, and adjust the Quantity of material, labor and machine, to finish the unit price calculation. The details can be shown if click the [calculation table of unit price]. If one item is similar with the others, you can click on [choose the existing price] to choose the unit price from the existing price.

The equipment unit price of installation project needs to be calculated also, as follows:


(4)Unit Price of Labor, Material and Machine
The labor, material and machine shown in a specific item are used to complete the list of budget. In this window, user can input the unit price of the labor, material and machine composing.


(5)Other Cost Estimate
Other cost estimate calculated in two ways:
Quantity¡ÁUnit price
Radix¡ÁRate


(6)Yearly Investment
Set investment progress, as follows:


(7) Total Budget


(8) Labor, material and machine total


(9)Budget form
The system automatically generates budget forms, which are based on the standards of budgetary estimate on feasibility study report. They can be printed or exported to Excel format.